Use structured-plan-mode skill

handbook-structured-plan-mode

A structured approach for planning and tracking complex feature implementations through systematic task decomposition.

The structured-plan-mode skill provides a phased methodology for breaking down large, multi-component features into manageable tasks with clear goals, dependencies, and success criteria. It emphasizes iterative research, user collaboration, and disciplined task tracking throughout implementation.

When to Use This Skill​

Use the structured-plan-mode skill when you want to:

  • Plan complex features requiring multiple components or integration points
  • Manage multi-step implementations spanning several days with interdependent tasks
  • Establish pattern-setting work that will guide future development
  • Evaluate multiple approaches before committing to implementation
  • Track progress systematically through large feature builds

Do NOT use for simple bug fixes, trivial features, one-off scripts, or work with a single clear implementation path.

Skill Specification​

---
name: structured-plan-mode
description: This skill should be used when planning and tracking complex feature implementations that require systematic task decomposition. Use this skill to break down large features into manageable, well-documented tasks with clear dependencies, action items, and success criteria. The skill provides a structured template and methodology for iterative planning and tracking throughout implementation.
---

# Structured Plan Mode Skill

## Purpose

This skill provides a structured approach for planning and tracking complex feature implementations through systematic task decomposition. It helps break down large, multi-component features into manageable tasks with clear goals, dependencies, and success criteria.

## When to Use This Skill

Use this skill when:
- **Complex features**: Features requiring multiple components or integration points
- **Multi-step implementations**: Work spanning several days with interdependent tasks
- **Pattern-setting work**: Features that will establish patterns for future development
- **Research required**: Work where multiple approaches need evaluation

Do NOT use this skill for:
- Simple bug fixes
- Trivial feature additions
- One-off scripts or experiments
- Work with single, clear implementation path

## How to Use the Skill

**IMPORTANT**: This is a PHASED approach. Complete each phase BEFORE moving to the next.

### Phase 1: Initial Setup

**Actions:**
1. Create `.plans/[feature-name]/` directory (in current project directory)
2. Copy `assets/plan-template.md` to `.plans/[feature-name]/plan.md`
3. Create `.plans/[feature-name]/tasks/` directory for task files
4. Replace `[Feature Name]` with your feature name in plan.md
5. Fill in basic overview and context
6. Create Research section with:
- Goal
- Context
- Strategy Proposals (leave empty for now)
- **Leave "Selected Approach" EMPTY**
7. Create a todo list by using TodoWrite based on the phases below


**TodoWrite tracks ONLY phases 1-4:**
```
- [ ] Phase 1: Setup template with Research section
- [ ] Phase 2: Conduct research and iterate with user
- [ ] Phase 3: Finalize selected approach
- [ ] Phase 4: Create implementation tasks (T01-T0N)
```

**Mark Phase 1 as completed in TodoWrite**

**Output**: Skeleton plan document with Research section defined and todo list created for phases 1-4

---

### Phase 2: Conduct Research and Iterate with User

**Research Process (Iterative):**
1. **Explore codebase**: Read relevant files, find similar patterns
2. **Document findings incrementally**: Add to "Key Findings" as you discover
3. **Identify 2-3 approach options**: Add to "Strategy Proposals" section
4. **ITERATE with user on EACH proposal**:
- Present each proposal with trade-offs (pros/cons)
- Use `AskUserQuestion` to clarify requirements and constraints
- **User may correct assumptions** - update research based on feedback
- Refine understanding through questions (typically 3-5 questions, but quality over quantity)
- **If user strongly prefers one approach early**, you may skip detailed discussion of remaining options
5. **Proactively ask if research is complete**: Once you've explored all options and answered clarifying questions, explicitly ask: "Are you ready to select an approach?"

**CRITICAL**:
- This is an ITERATIVE process - expect back-and-forth discussion on each proposal
- Use AskUserQuestion frequently to refine understanding
- Don't wait for user to say research is done - ASK them proactively

**Mark Phase 2 as completed in TodoWrite when user confirms that research is complete**

**Output**: Research with 2-3 Strategy Proposals documented and reviewed with user

---

### Phase 3: Finalize Selected Approach

**Actions:**
1. **Ask the user to select an approach** using AskUserQuestion (present the 2-3 researched approaches as formal selection options)
2. **Once user confirms their selection**, fill "Selected Approach" section with:
- **Decision**: Which approach was selected (must match user's confirmed preference)
- **Rationale**: Why this approach was chosen over alternatives
- **Key Findings**: Summarize important discoveries from research
- **Implementation Plan**: High-level steps (5-7 bullet points)
3. Mark all research action items as [x] completed
4. Change research status to βœ… **Completed**
5. Update Progress Summary to show research complete

**Mark Phase 3 as completed in TodoWrite once Selected Approach section is fully documented**

**Output**: Research fully documented with clear decision and rationale

---

### Phase 4: Create Implementation Tasks (ONLY AFTER Phase 1-3 Complete)

**IMPORTANT**: Before creating tasks, read `references/task-planning-guide.md` to understand:
- How to break down work into appropriate task sizes
- Task file structure and required sections
- Best practices for defining clear requirements and action items
- How to set proper dependencies between tasks

**Actions:**
**NOW create T01, T02, T03, ...T0N** as separate files in `.plans/[feature-name]/tasks/` based on selected approach

- Number of tasks depends on complexity (simple: 1-2, medium: 3-5, complex: 5+)
- Break down into manageable chunks (2-5 days each)

**Step-by-Step: Creating a Task File**

For each task you need to create:

1. **Copy the template**:
```bash
cp [path-to-task-template.md] .plans/[feature-name]/tasks/T01.md
```
2. **Update task header**: Replace `T0X` with actual task number (T01, T02, etc.)
3. **Fill in core sections**:
- Goal: One clear, measurable objective
- Context: How it relates to the feature and selected approach
- Requirements: Detailed specifications with implementation steps
- Action Items: Specific checkboxes for work to complete
4. **Update metadata**: Set Status (🟑 Planned), Effort (Small/Medium/Large), Blocked By
5. **Add to Progress Summary**: Update plan.md with link: `- [ ] [**T01**: Task Name](tasks/T01.md) - Status: 🟑 Planned`

**Mark Phase 4 as completed in TodoWrite**

**Output**: Complete task breakdown (T01.md - T0N.md files) in tasks/ folder, all linked from plan.md Progress Summary

---

### Phase 5: Working with Tasks (Implementation)

**Note**: Phase 5 is NOT tracked in TodoWrite. Track progress directly in task files and plan.md.

**IMPORTANT**: Before starting work on ANY task, read `references/task-planning-guide.md` for:
- Task structure guidance and best practices
- How to maintain task files during execution
- Examples of effective task documentation
- Common pitfalls to avoid

**When to consult task-planning-guide.md:**
- Before starting a new task (every time)
- When unclear about task file structure or what to document
- When encountering challenges during task execution
- When adding new tasks mid-implementation

#### Task Execution Discipline

**CRITICAL RULE**: Work on ONE task at a time. Do NOT start the next task until the current task is FULLY completed.

**Task Status Flow:**
1. 🟑 **Planned** β†’ Task created but not started
2. 🟒 **In Progress** β†’ Currently working on this task (only ONE task should be in this state)
3. βœ… **Completed** β†’ All action items done, both locations updated, Execution Summary filled
4. πŸ”΄ **Blocked** β†’ Cannot proceed due to dependency or external issue (move to next task until unblocked)

#### Task Lifecycle: Step-by-Step

**Starting a Task:**
1. **Read `references/task-planning-guide.md`** - Review relevant sections before beginning work
2. Choose next task from plan.md Progress Summary (respecting dependencies)
3. Update status to 🟒 **In Progress** in TWO places:
- Task file metadata: `**Status**: 🟒 **In Progress**`
- plan.md Progress Summary: `- [ ] [**T01**: Task Name](tasks/T01.md) - Status: 🟒 In Progress`

**During Task Execution:**
4. Work through Action Items, checking off boxes as you complete them:
```markdown
- [x] Create API endpoint
- [x] Add request validation
- [ ] Add error handling ← Currently working here
- [ ] Write tests
```
5. Update task file in real-time as work progresses
6. If you discover new requirements, add them to Action Items

**Completing a Task:**
7. Verify ALL action items are checked: `[x]`
8. Fill in "Execution Summary" section in task file:
```markdown
## Execution Summary
**Completed**: 2025-01-08 14:30

**What was implemented**:
- Added /api/users endpoint with validation
- Implemented error handling for edge cases

**Challenges encountered**:
- Had to refactor auth middleware to support new endpoint
```
9. Update status to βœ… **Completed** in TWO places:
- Task file metadata: `**Status**: βœ… **Completed**`
- plan.md Progress Summary: `- [x] [**T01**: Task Name](tasks/T01.md) - Status: βœ… Completed`
10. **Explicitly ask user**: "Task T01 is complete. Ready to move to T02?"
11. **ONLY after user confirms** proceed to next task

#### Dual-Tracking Example

When completing T01, you must update BOTH locations:

**In `tasks/T01.md`** (lines 7-9):
```markdown
**Status**: βœ… **Completed**
**Effort**: Medium
**Blocked By**: None
```

**In `plan.md` Progress Summary** (line ~18):
```markdown
- [x] [**T01**: Add API endpoint](tasks/T01.md) - Status: βœ… Completed
```

**Why dual-tracking?**
- plan.md provides high-level overview of all tasks at a glance
- Task files provide detailed implementation notes for deep dives
- Both serve different purposes and audiences

#### Handling Blocked Tasks

If you cannot complete a task:
1. Update status to πŸ”΄ **Blocked** in both locations
2. Update "Blocked By" field in task file metadata
3. Document blocking reason in task file
4. Move to next non-blocked task
5. Return when blocker is resolved

#### Discovering New Tasks Mid-Implementation

If you discover additional work during Phase 5:
1. Create new task file (e.g., `T06.md`) in tasks/ directory
2. Fill in all sections using task-template.md
3. Add link to plan.md Progress Summary
4. Update dependent tasks if needed

---

**Remember**: ONE task at a time. Complete it FULLY (all checkboxes, both locations updated, Execution Summary filled), then ASK USER for confirmation before moving to the next.

---

### Phase 6: Post-Implementation Review

**Note**: Phase 6 is NOT tracked in TodoWrite. Update the plan document directly.

After feature completion:
- Fill in "Lessons Learned" section
- Verify all task statuses are accurate
- Document any technical debt or future work
- Review what went well and what could improve

## Workflow Summary

**TodoWrite tracks ONLY phases 1-4 (not subtasks):**
```
- [ ] Phase 1: Setup template with Research section
- [ ] Phase 2: Conduct research and iterate with user
- [ ] Phase 3: Finalize selected approach
- [ ] Phase 4: Create implementation tasks (T01-T0N)
```

**Phase-by-Phase Workflow:**

1. **Phase 1 - Setup**:
- Create `.plans/[feature-name]/` and `.plans/[feature-name]/tasks/` directories
- Copy plan-template.md to `.plans/[feature-name]/plan.md`
- Create Research section ONLY in plan.md
- DO NOT create T01, T02, T03 task files yet
- Mark Phase 1 complete in TodoWrite

2. **Phase 2 - Research & Iterate** (AskUserQuestion REQUIRED):
- Explore codebase, document findings in plan.md
- Present 2-3 approach options
- **Iterate on EACH proposal** via AskUserQuestion (discuss trade-offs, clarify constraints)
- User may correct assumptions - update research
- **If user strongly prefers one approach**, may skip detailed discussion of remaining options
- **Proactively ask**: "Are you ready to select an approach?"
- Mark Phase 2 complete when user confirms

3. **Phase 3 - Finalize**:
- Present 2-3 researched approaches and ask user to select one
- Once user confirms, fill "Selected Approach" section in plan.md
- Mark research as βœ… Completed in plan.md
- Mark Phase 3 complete once documentation is done

4. **Phase 4 - Create Tasks**:
- **Read `references/task-planning-guide.md` before creating tasks**
- NOW create T01.md, T02.md, T03.md, ...T0N.md files in `.plans/[feature-name]/tasks/`
- Copy task-template.md for each task file
- Fill in task details based on selected approach
- Number of tasks depends on complexity
- Update Progress Summary in plan.md with links to task files
- Mark Phase 4 complete in TodoWrite

5. **Phase 5 - Implementation** (ONE task at a time):
- **Read `references/task-planning-guide.md` before starting EACH task**
- Work on ONE task until FULLY completed (all checkboxes, both locations updated, Execution Summary filled)
- Update status in TWO places: task file metadata AND plan.md Progress Summary
- Track progress: 🟑 Planned β†’ 🟒 In Progress β†’ βœ… Completed
- Check off action items as you complete them
- Fill Execution Summary before marking complete
- **Explicitly ask user for confirmation** before moving to next task
- ONLY after user confirms proceed to next task

6. **Phase 6 - Review**:
- Document lessons learned in plan.md


## Key Patterns from Successful Use

### Pattern 1: Follow Existing Patterns
During research phase, research existing similar features and match their architecture exactly.
**Benefit**: Consistent codebase, faster implementation, reduced bugs.

### Pattern 2: Simplify When Possible
During research, look for ways to simplify (e.g., avoid unnecessary API calls).
**Benefit**: Reduced dependencies, better performance, easier maintenance.

### Pattern 3: Discover Existing Implementations
Research phase may reveal the work is already done - mark task complete.
**Benefit**: Avoids duplicate work, leverages tested code.

### Pattern 4: Document Design Decisions
During research phase, use the **"Selected Approach"** section to document WHY you chose one approach over alternatives.
Include: decision, rationale, key findings, and implementation plan.
**Benefit**: Future developers understand rationale, prevents second-guessing, provides clear starting point.

### Pattern 5: Keep Tasks Focused
Break large tasks into smaller chunks that are independently testable.
**Benefit**: Steady progress, clear milestones, easier to parallelize.

## Reference Materials

**CRITICAL**: `references/task-planning-guide.md` is NOT just for planning - read it throughout implementation.

**Read `references/task-planning-guide.md`:**
- **Phase 4**: Before creating task files (understand task structure, sizing, dependencies)
- **Phase 5**: Before starting EACH task (review best practices, avoid common pitfalls)
- **During execution**: When updating task files, adding action items, or documenting progress
- **When stuck**: Consult checklist for good task planning and common pitfalls section

**Additional reference:**
- `references/usage-guide.md` - Detailed template section explanations

---

**Remember**:
1. **TodoWrite tracks PHASES** - not individual subtasks
2. **Phases are sequential** - complete Phase 1 before Phase 2, etc.
3. **Phase 2 is iterative** - use AskUserQuestion multiple times, expect back-and-forth
4. **User confirms approach** - do NOT fill "Selected Approach" until user confirms
5. **No premature planning** - T01-T0N created in Phase 4
6. **Task count is flexible** - create as many as needed (T01, T02, ...T0N)
7. **ONE task at a time** - Complete current task FULLY (all checkboxes, both locations, Execution Summary) before starting next
8. **Dual-tracking required** - Update status in BOTH task file AND plan.md
9. **Explicit user confirmation** - Ask user for approval before moving to next task
10. **Read task-planning-guide.md** - Before Phase 4, before EACH task in Phase 5, and when stuck

Key Concepts​

Phased Approach​

The skill follows a strict 6-phase workflow:

  1. Phase 1 - Setup: Create .plans/[feature-name]/ structure with plan.md and Research section
  2. Phase 2 - Research: Explore codebase, propose strategies, iterate with user
  3. Phase 3 - Finalize Selected Approach: Document selected approach with rationale in plan.md
  4. Phase 4 - Task Creation: Create task files (T01.md - T0N.md) in .plans/[feature-name]/tasks/
  5. Phase 5 - Implementation: Track task completion in individual task files
  6. Phase 6 - Review: Document lessons learned in plan.md

TodoWrite Integration​

The skill uses TodoWrite to track only phases 1-4, not individual subtasks:

- [ ] Phase 1: Setup template with Research section
- [ ] Phase 2: Conduct research and iterate with user
- [ ] Phase 3: Finalize selected approach
- [ ] Phase 4: Create implementation tasks (T01-T0N)

Phases 5-6 are tracked directly in individual task files (.plans/[feature-name]/tasks/T01.md, etc.) and progress summary in plan.md.

User Collaboration​

Phase 2 emphasizes active iteration with the user through AskUserQuestion:

  • Present 2-4 approach options with trade-offs
  • Get user input on preferences and assumptions
  • Iterate until user explicitly confirms the preferred approach
  • User feedback may correct assumptionsβ€”update research accordingly

No Premature Planning​

Tasks (T01, T02, etc.) are created only in Phase 4, after research is complete and the approach is confirmed. This prevents wasted planning effort on approaches that won't be selected.

Example Workflow​

User Request: "Add real-time collaboration features to the document editor"

Phase 1: Create .plans/collaboration-feature/ directory with plan.md and Research section

Phase 2:

  • Research WebSocket libraries, existing real-time features
  • Propose 3 approaches: WebRTC, WebSockets, or Firebase
  • Use AskUserQuestion to present trade-offs
  • User confirms WebSockets approach

Phase 3: Document selected approach with rationale in the Selected Approach section of plan.md

Phase 4: Create task files in .plans/collaboration-feature/tasks/:

  • T01.md: Implement WebSocket server
  • T02.md: Add client connection handling
  • T03.md: Sync document state
  • T04.md: Handle conflict resolution
  • T05.md: Add presence indicators

Phase 5-6: Execute tasks, track progress in individual task files, document lessons learned in plan.md

Success Indicators​

Effective use of this skill shows:

  • βœ… TodoWrite tracks phases, not subtasks
  • βœ… .plans/[feature-name]/ directory structure created
  • βœ… Research section created first in plan.md, task files (T01.md - T0N.md) created later in tasks/ folder
  • βœ… AskUserQuestion used multiple times for iteration
  • βœ… Selected approach documented only after user confirmation
  • βœ… Task count matches complexity (1-2 simple, 3-5 medium, 5+ complex)
  • βœ… Clear rationale for approach selection
  • βœ… Tasks sized appropriately (2-5 days each)